I finished the First Grade Quilt after Easter so I could not stitch on any Chatelaines.
I need to finish a Love Quilt square by May 1st so I won't be stitching on anything until that is done.
After that, I think I'll do something quick to get my cross stitching groove back--I miss working with my silks, although the quilting was fun.
I need to finish a Love Quilt square by May 1st so I won't be stitching on anything until that is done.
After that, I think I'll do something quick to get my cross stitching groove back--I miss working with my silks, although the quilting was fun.

25/25 Project Challenge